Harga Kayu Binaan di Malaysia

Timber price in Malaysia

Harga purata kayu binaan di Malaysia dari data rasmi CIDB N3C, dengan trend perubahan harga sepanjang setahun. Pilih negeri anda di bawah untuk harga tempatan.

Bahan / MaterialUnitTerma bayaranHarga (RM)Trend 1 tahun
MLHW 1"x 2"x 8' up - Local / Grade BMT60 hariRM1,550.56
MLHW 1"x 2"x 8' up - Local / Mix WoodMT60 hariRM1,487.22
MLHW 2"x 2"x 8' up (Hard Tanalised) Grade CMT60 hariRM1,347.22
MLHW 2"x 2"x 8' up (Soft Tanalised) Grade CMT60 hariRM1,277.22
MLHW 2"x 2"x 8' up (Soft) Grade CMT60 hariRM1,250.56
MLHW 2"x 3"x 8' up - Mix WoodMT60 hariRM1,423.89
MLHW 2"x 4"x 8' up - Mix WoodMT60 hariRM1,480.56
MLHW 3"x 3"x 8' up - Grade CMT60 hariRM1,578.89
MLHW 3"x 4"x 8' up - Mix WoodMT60 hariRM1,595.56
MLHW 3"x 5"x 8' up - Grade CMT60 hariRM1,632.22
MLHW 3"x 6"x 8' up - Grade CMT60 hariRM1,688.89
Timber Plank 2"x 8"x 14' - Grade CMT60 hariRM1,665.56

Sumber: CIDB N3C (Pusat Kos Pembinaan Negara), dikemas kini Mei 2026. Harga purata Malaysia adalah purata rujukan pasaran, dapatkan sebut harga pembekal untuk projek anda.

Harga kayu binaan mengikut negeri

Kenapa cari tender di CoTender?

  • Satu tempat
    Setiap tender kerajaan dari MyProcurement, ePerolehan dan portal agensi, dikumpulkan dan dikemas kini sepanjang hari.
  • Ditapis untuk anda
    Lihat hanya tender yang anda layak sertai mengikut gred, bidang dan pendaftaran anda.
  • Sedia untuk bida
    Dokumen, tarikh tutup, taklimat dan harga pasaran, semua di satu tempat.

Bahan binaan lain

Semak tender kerajaan yang anda layak sertai

Percuma untuk kontraktor CIDB, feed tender ditapis mengikut gred & pengkhususan anda.

Percuma untuk bermula · Tiada kad kredit